ELEVATOR ENTRANCE METALWORK

Stainless Steel Elevator Door Frames

Coordinate decorative elevator entrance surrounds with site openings and the elevator supplier’s interfaces. Panel joints, reveals and returns guide the metalwork review.

Discuss Your Project
Metal-clad columns within a hotel lobby
Related architectural applicationRelated architectural application: hotel lobby column cladding provides a reference for panel junctions and finish coordination, rather than an elevator frame example.

Typical Applications

  • Hotel elevator lobby surrounds
  • Office lift entrance cladding
  • Renovation projects with coordinated door reveals

Customization Options

Customization Options
Project parameterInformation for review
DimensionsSurveyed site opening and finished wall build-up.
GeometryFace widths, reveals, returns and panel joints.
MaterialGrade and sheet thickness for the cladding detail.
FinishGrain and colour direction by panel.
InterfacesFixings and elevator supplier clearances.
QuantityFloor and entrance schedule with panel identifiers.

Material & Finish Review

Materials

  • 304 stainless steel: review lobby exposure and cleaning.
  • 316L stainless steel: assess moisture or chloride exposure at the entrance.

Finishes

  • Brushed surfaces with marked grain direction.
  • Polished or PVD colour references coordinated across jambs and heads.

Selection Considerations

  • Verify site opening dimensions against the elevator supplier’s interface drawings.
  • Coordinate panel joints, reveal and return depth with the finished wall.
  • Agree fixing access, grain direction and colour orientation across the entrance.

Drawing & Fabrication Workflow

  1. Review entrance interfaces

    Compare surveyed openings with elevator and wall detail drawings.

  2. Coordinate panel divisions

    Review joints, returns, fixing access and visible finish directions.

  3. Confirm entrance schedules

    Agree panel labels, inspection requirements and packing by floor.

For Contractors & Installers

  • Obtain interface approval from the responsible elevator supplier.
  • Keep required operating clearances accessible for review.
  • Confirm any documentation requirements with the project’s responsible specialists.

Image Context

Related architectural application: hotel lobby column cladding provides a reference for panel junctions and finish coordination, rather than an elevator frame example.

Frequently Asked Questions

What is included in the frame review?

Review decorative surrounds, wall returns and fixing interfaces against the elevator supplier’s drawings to define the metalwork scope.

How are entrance dimensions confirmed?

Compare a site survey with finished wall levels and the supplier’s required clearances before agreeing panel sizes.

How should grain and colour be specified?

Mark each panel’s grain direction and colour orientation, then compare finish references under the intended lobby lighting.

Warm-tone metal border surrounding a decorative inlay panel
Product detailProduct detail: a warm-tone metal border around an inlay panel, shown as an edging reference; the image does not identify the alloy or coating.

Stainless Steel Trims & Metal Edging

Bring Your Project Drawings to the Review

Share drawings, application environment, finish requirements and quantities to discuss the fabrication scope.

FORGAX

FORGAX provides drawing-based sheet metal fabrication and metal product manufacturing from material sourcing and production to finishing, inspection, assembly and export packaging.

Chengdu Huajin Jiayi E-commerce Co., Ltd.

EXPLORE

CONTACT

© 2026 Chengdu Huajin Jiayi E-commerce Co., Ltd.. All rights reserved.

Custom Sheet Metal Fabrication · OEM / ODM Manufacturing

WhatsApp